Empirical Renovations crew tearing out an old deck and brick landing with debris loaded into a dump trailer in Vermont
★★★★★ 5.0 on

Deck Demolition Contractor in Vermont

Taking a deck down is the easy half. What is left behind is a hole where the footings were, a scar on the siding, and a pile that has to go somewhere, and that is the part most quotes stay quiet about.

4+ Years in Business
$8K+ Avg. Client Savings
100+ Clients Served

Get a Free Deck Removal Estimate

  1. Tell Me What Is Coming Out

    Size, height and whether it is attached to the house. Photos help. Call or fill out the form and I respond within 24 hours.

  2. I Look at the Footings and Ledger

    Whether piers come out or get cut below grade, and what is behind the ledger, are the two things that move the price.

  3. You Get Teardown and Haulage Itemised

    Demolition, disposal and the siding repair where the deck met the house, listed separately rather than as one number.

We never share your information.

Deck Removal Reviews from Vermont Homeowners

Want to see more?

The Same House, Before and After

Drag the slider. An elevated deck spanning the front of the house on one side, the wall back to bare siding on the other, with the ledger patched and the footings out.

The same Vermont home after Empirical Renovations removed the deck, siding back to bare and lumber stacked in the driveway for the rebuild After
Elevated deck with green railings spanning the front of a Vermont home above the garage, before demolition by Empirical Renovations Before

What a Deck Removal Includes

A teardown runs in reverse of the build: railings, decking, joists, ledger, then posts and footings. Price comes down to how the deck was attached and how much concrete is underneath. A bolted ledger means siding repair.

  • Full Structural Teardown

    Railings, boards, joists and beams taken down in order and cut to size for hauling rather than dragged across the lawn.

  • Footing and Pier Removal

    Concrete piers dug out and broken up, or cut below grade if you are landscaping over. Left in place only if you want them for the next build.

  • Ledger Removal

    The board bolted to the house comes off, and whatever the water has done to the rim joist behind it becomes visible. Often the real find of the job.

  • Siding and Wall Repair

    The scar where the deck met the house patched and the siding closed up, flashed properly so the wall is weathertight again.

  • Hauling and Disposal

    Everything loaded and taken away, pressure-treated separated from clean lumber because the two cannot go to the same place.

  • Site Left Clean

    Ground raked, fasteners picked up, holes backfilled. A yard full of rusty nails after a teardown is a genuinely dangerous thing to leave.

Why Cleanup Is the Part of Deck Removal That Matters

Demolition quotes that come in cheap are usually cheap because they end when the deck is in a pile. Footings stay in the ground, the ledger scar gets covered rather than flashed, and the disposal becomes your problem.

If the deck is coming off the house, the wall behind it is exposed and it is the one chance to see and fix what has been happening back there. That is worth doing while it is open, especially if a new deck is going back in the same spot.

  • Footings Stated in the Quote

    The estimate says whether piers are coming out or being cut below grade. That single line is most of the difference between two quotes.

  • The Wall Gets Inspected

    Once the ledger is off I show you what the water has done to the rim joist before anything is closed back up.

  • Disposal Handled Properly

    Pressure-treated is separated from clean lumber at disposal, since it cannot be burned or taken as clean wood waste.

Gavin Williams, owner of Empirical Renovations, a licensed deck builder in South Burlington VT

Get the Old Deck Priced and Gone

One visit tells me how it was attached and what is underneath, which is most of what decides the number.

Common Deck Removal Questions

How much does deck removal cost?

Breaking out and hauling concrete piers is the heaviest part of a teardown. Cutting them below grade and backfilling costs far less and is fine if you are landscaping over the area. The quote says which one you are getting, because that line is where cheap quotes get cheap.

What happens to the wall where the deck was attached?

When the ledger comes off the house, the rim joist behind it is exposed for the first time since the deck went on. If water has been getting in, that is where it shows. Covering it back up without looking is a wasted opportunity.

Where does the old deck material end up?

Treated lumber carries preservatives, so it cannot be burned or taken as clean wood. It gets separated at disposal and goes where it is supposed to go, which is part of what you are paying for on a teardown.

What condition is the site left in?

A yard full of rusted fasteners after a demolition is genuinely dangerous, especially with kids or dogs. Ground raked, screws and nails picked up, holes backfilled. The job is finished when the space is usable, not when the deck is gone.

Service Area

I Tear Decks Out Across Northern Vermont

Most contractors will not make the drive for a teardown on its own. I will, and the dumpster comes with me. I cover Chittenden, Franklin, Grand Isle, Lamoille and Washington Counties.

Chittenden County 18 towns

  • Bolton, VT 05676
  • Burlington, VT 05401
  • Charlotte, VT 05445
  • Colchester, VT 05446
  • Essex, VT 05451
  • Essex Junction, VT 05452
  • Hinesburg, VT 05461
  • Huntington, VT 05462
  • Jericho, VT 05465
  • Milton, VT 05468
  • Richmond, VT 05477
  • Shelburne, VT 05482
  • South Burlington, VT 05403
  • St. George, VT 05495
  • Underhill, VT 05489
  • Westford, VT 05494
  • Williston, VT 05495
  • Winooski, VT 05404

Franklin County 15 towns

  • Bakersfield, VT 05441
  • Berkshire, VT 05447
  • Enosburg, VT 05450
  • Fairfax, VT 05454
  • Fairfield, VT 05455
  • Fletcher, VT 05444
  • Franklin, VT 05457
  • Georgia, VT 05454
  • Highgate, VT 05459
  • Montgomery, VT 05471
  • Richford, VT 05476
  • Sheldon, VT 05483
  • St. Albans City, VT 05478
  • St. Albans Town, VT 05478
  • Swanton, VT 05488

Grand Isle County 3 towns

  • Grand Isle, VT 05458
  • North Hero, VT 05474
  • South Hero, VT 05486

Lamoille County 10 towns

  • Belvidere, VT 05442
  • Cambridge, VT 05464
  • Eden, VT 05653
  • Elmore, VT 05657
  • Hyde Park, VT 05655
  • Johnson, VT 05656
  • Morrisville, VT 05661
  • Stowe, VT 05672
  • Waterville, VT 05492
  • Wolcott, VT 05680

Washington County 5 towns

  • Duxbury, VT 05676
  • Middlesex, VT 05602
  • Moretown, VT 05660
  • Waterbury, VT 05676
  • Waterbury Center, VT 05677

Get the Old Deck Gone and the Site Left Clean

Demolition is the easy half. The quote covers the footings, the wall behind the ledger and the haulage, not just the deck being in a pile.